Everything we do answers one of three questions: does it work, can it be built, and is the decision defensible? We carry a biobased or circular material from a lab result to a running plant — proving it on our own line before a euro of capital is committed.
Wherever you are — a lab result, a pilot, or a plan to scale — the first step is small, gated, and priced to let you in.
Tell us the material and where it needs to get to. We come back with a scoping note and a realistic plan.
Under NDA · no commitmentWe validate it on our own pilot line at Lemi — gate by gate, so you pay as you prove and can stop after any gate.
Start at a startup's budgetWhen the evidence holds, we engineer the scale-up — full EPCM, concept to a running plant, and stay to performance.
One team, end to endThe crossing from lab to factory needs four things at once, and no single specialist carries them.
A lab result is not a production line. Without validation on real equipment, no buyer qualifies it and no investor backs it.
Turning a process into a costed, buildable plant is a discipline most material innovators don't hold in-house.
Capital waits for de-risked evidence; evidence waits for capital. Ventures stall in the gap between the two.
Even a proven material needs a route into a real supply chain — the mill, the converter, the brand that buys it.
The constant isn't the material. The same method reaches from a founder's first gated pilot to a €280M mill, and from Finland to Latin America.